CAIT project no.: 197 RU2774
Fiscal Year: 2006/2007
Status: Final
Rutgers-CAIT Author(s): Kaan Ozbay, Bekir Bartin
External Author(s): W. Lad Szalaj, NJDOT Research Project Manager
Sponsor(s): NJDOT, FHWA-USDOT
Procedures for determining allowable lane closure hours to perform maintenance, construction, resurfacing, regional permit and major access permit work on the state highway system were evaluated. The current process involves the collection of traffic volumes, consultation with local authorities and the reliance on previous knowledge of the roadway to develop allowable lane closing hours. This is an ad-hoc process that lacks uniformity and does not make use of traffic engineering basics to assess the impacts of lane closures. Thus, there is a need to develop a process for determining and modifying lane closures that will have uniformity and take into account effects on productivity and traffic delay. The major goals of this study include the development of a uniform process for lane closures that takes into account the impact of lane closure on traffic and productivity, and the adoption of this uniform process throughout the NJDOT.